Week 4 : Roofing

Updated: Feb 12

With the scaffolding all in place and safety nets correctly fixed we are ready for the roofer.


The first step is the fascia, which forms a neat perimeter for the roof and trims the rafters.

ColourSteel Endura 6 rib roofing is laid over the top of Tekton paper and mesh.


Mesh prevents the paper from sagging and the paper is a secondary moisture barrier and prevents moisture condensing on the underside of the ColourSteel roof.


Getting the roof on is always a milestone. It opens up a whole raft of wet weather work and helps protect the frames from the elements.